Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Lincoln Yards North Building A.2
Building
Proposed
Office
96 m / 315 ft
20
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
06 March 2019
The US$6 billion Lincoln Yards megadevelopment will include 600 affordable housing units – twice as many as required in a compromise by Sterling Bay as...
06 March 2019
The US$6 billion Lincoln Yards megadevelopment will include 600 affordable housing units – twice as many as required in a compromise by Sterling Bay as...
25 January 2019
A $6 billion development that would transform 55 acres (22 hectares) along the North Branch of the Chicago River is a key step closer to...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy