You must be a CTBUH Member to view this resource.
Cascade
Link at Douglas, Tower II
Building
Completed
2023
Residential
concrete
123 m / 404 ft
36
421
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
12 February 2020
The developers at a massive mixed-use project along U.S. Highway 1 just closed on a US$99 million construction loan for Tower II of the Link...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy