You must be a CTBUH Member to view this resource.
Lumina
Lumina Tower Residences
Building
Completed
2016
Residential
All-Concrete
130 m / 427 ft
34
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Alberto Vidal Zuazua, Vidal Arquitectos; Miguel Angel Barroso Morales, Universidad Autónoma de Coahuila
Architecture must combine an aesthetic proposal that harmonizes with the environment, and a practicality that fits the demographic and economic conditions of the location in...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy