You must be a CTBUH Member to view this resource.
Martin Tower
Bethlehem Steel Martin Tower
Building
Demolished
1972
Office
All-Steel
101.2 m / 332 ft
21
11
59,789 m² / 643,563 ft²
Construction Start
Completed
Demolished
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 May 2019
In 14 seconds on Sunday, 19 May, a poignant and fittingly spectacular end came to the former world headquarters of Bethlehem Steel. As bystanders lined...
20 May 2019
In 14 seconds on Sunday, 19 May, a poignant and fittingly spectacular end came to the former world headquarters of Bethlehem Steel. As bystanders lined...
09 April 2019
Despite being listed on the National Register of Historic Places in 2010, the former Bethlehem Steel headquarters will be imploded on May 19, 2019, making...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy