You must be a CTBUH Member to view this resource.
Millie on Michigan
citizenM Chicago Downtown, 300 NMA
Building
Completed
2022
Residential / Hotel
All-Concrete
Green Globes 2-Globes
157.1 m / 515 ft
47
2
289
280
22
10
5 m/s
40,772 m² / 438,866 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
05 October 2021
In Chicago, 300 NMA has reached its final height of 47 floors and 157.6 meters (517 feet). Located at 300 N. Michigan Avenue, the project...
05 October 2021
In Chicago, 300 NMA has reached its final height of 47 floors and 157.6 meters (517 feet). Located at 300 N. Michigan Avenue, the project...
20 July 2020
Two major Chicago developers are expected to break ground next month on a 47-story apartment and hotel tower on North Michigan Avenue, in what would...
13 August 2019
Just weeks after securing a zoning change from city officials, developer Sterling Bay is moving forward with its plans to demolish an older building on...
28 March 2019
One of Chicago’s busiest real estate developers wants to build a 47-story residential and hotel tower on a stretch of North Michigan. Sterling Bay is...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy