You must be a CTBUH Member to view this resource.
M.M. Towers Foresis-R
Minato Mirai Towers Foresis-R
Building
Completed
2007
Residential
All-Concrete
107.3 m / 352 ft
30
1
601
872
9,818 m² / 105,680 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy