Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Zermatt
Monte South C Wing, Monte South Tower 3, Monte South Zermatt
Building
Proposed
2026
Residential
All-Concrete
64
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
25 March 2019
A joint venture between Marathon Group and Adani Realty has secured RS500 crore (US$72.5 million) funding from HDFC Bank to develop the second phase of...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy