You must be a CTBUH Member to view this resource.
National Lift Tower
Tower
Completed
1982
Industrial
All-Concrete
127.3 m / 417 ft
18
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Steven White, Studor Limited
The drainage systems in tall buildings are being subjected to greater loadings. The effect of negative and positive transients is, therefore, becoming a larger issue....
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy