You must be a CTBUH Member to view this resource.
Novotel Melbourne South Wharf Hotel
Convention Centre Hotel
Building
Completed
2018
Hotel
All-Concrete
97 m / 318 ft
26
347
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
06 April 2018
Hotel operator Accor has opened the AU$150 million (US$115 million) Novotel Melbourne South Wharf Hotel, one of several Melbourne hotel properties that will add to...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy