Note: As this project is structurally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Olympia DUMBO
Building
Structurally Topped Out
2022
Residential / Education
All-Concrete
26
76
73
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
14 September 2021
A twisting 26-story tower has topped out alongside Brooklyn Bridge. Located at 30 Front Street, the façade at Olympia Dumbo has reached about midway up...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy