Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Pinnacle One Yonge Tower 5
Building
Proposed
Office
98.2 m / 322 ft
22
4
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
18 October 2016 | Toronto
Tuesday October 18, 2016. Shenzhen, China. David Pontarini of Hariri Pontarini Architects, presents at the 2016 China Conference Session 7a: Urban Environmental Issues. The City...
17 October 2016
David Pontarini, Hariri Pontarini Architects
The City of Toronto is experiencing rapid growth, with the second largest concentration of high-rise buildings under construction in North America, surpassing Chicago and coming...
21 February 2020
A new supertall skyscraper in Toronto will be significantly shorter than the 553-meter-tall CN Tower once complete, but still greatly change the city's skyline. Hariri...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy