You must be a CTBUH Member to view this resource.
Poly Puzhou Parcel 5, Tower 2
Building
Completed
2015
Office
96 m / 315 ft
22
3
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Travis Soberg, Goettsch Partners
The Greater Pearl River Delta region emerged as a result of China’s 1979 reform policies. Within the last 20 years, the GPRD has grown from...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy