You must be a CTBUH Member to view this resource.
Queen's Wharf Tower 2
Destination Brisbane Tower 2
Building
Completed
2024
Casino / Hotel
101 m / 331 ft
26
5
You must be a CTBUH Member to view this resource.
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 December 2019
Construction on Brisbane's AU$3.6 billion (US$2.5 billion) Queen's Wharf development is well underway, with five levels of basement closing nearing ground level. The giant hole...
20 December 2019
Construction on Brisbane's AU$3.6 billion (US$2.5 billion) Queen's Wharf development is well underway, with five levels of basement closing nearing ground level. The giant hole...
25 June 2019
Ten new tower cranes will hover across Brisbane’s inner-city skyline in the next six months as Brisbane’s Queen’s Wharf development enters the construction phase. A...
23 April 2019
Construction giant Multiplex has been awarded the massive development’s construction contract, estimated to be worth up to AU$1.5 billion (US$1.06 billion). At least 60 percent...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy