You must be a CTBUH Member to view this resource.
Shenzhen Rural Commercial Bank Headquarters
Rural Commercial Bank
Building
Completed
2020
office
composite
LEED BD+C CS (Core & Shell) Platinum
158.0 m / 518 ft
33
6
94,049 m² / 1,012,335 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
01 December 2016
The Rational Optimization and Evolution of the Structural Diagonal Aesthetic in Supertall Towers
Charles Besjak, Preetam Biswas & Tobias Fast, SOM
In the design of supertall towers, engineers often find the conventional frame systems used in countless buildings in the past decades incapable of providing the...
05 January 2022
"Breathable" Bank Headquarters Building Opens in Shenzhen
Skidmore, Owings & Merrill completed a new 518-foot-high (157-meter-tall), 33-story tower located on the edge of a public park in the center of one of...
01 December 2016
The Rational Optimization and Evolution of the Structural Diagonal Aesthetic in Supertall Towers
In the design of supertall towers, engineers often find the conventional frame systems used in countless buildings in the past decades incapable of providing the...
17 October 2016
SOM and China: Evolving Skyscraper Design Amid Rapid Urban Growth
China’s rapid urban and economic growth has challenged designers, engineers, and planners to innovate and collaborate to meet the needs of a changing country. Skidmore,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy