You must be a CTBUH Member to view this resource.
Sheraton Dallas Hotel Central Tower
Adam's Mark Dallas, Southland Center, Southland Life Building, Center Tower
Building
Completed
1959
Hotel
Office
All-Steel
167.6 m / 550 ft
42
5
1842
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Completed
Recladding
Retrofit End
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy