You must be a CTBUH Member to view this resource.
The Galbraith
Building
Completed
2022
Residential
All-Concrete
51 m / 167 ft
15
217
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
06 March 2020
Developers are breaking ground in downtown Dallas on a high-rise residential building. The apartment project at 2400 Bryan St. will include a combination of affordable...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy