You must be a CTBUH Member to view this resource.
The Leland
Ramada Inn Downtown Detroit, Leland House, Leland Hotel
Building
Completed
1927
Residential
Hotel
All-Steel
73.5 m / 241 ft
20
1
339
36,508 m² / 392,969 ft²
Construction Start
Completed
Retrofit Start
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy