You must be a CTBUH Member to view this resource.
The Peninsula Phase III Tower 2
Building
Completed
2018
Residential
All-Concrete
169.4 m / 556 ft
50
2
89
23,680 m² / 254,889 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy