You must be a CTBUH Member to view this resource.
303 East Wacker Drive
Three Illinois Center
Building
Completed
1979
Office
All-Concrete
106.7 m / 350 ft
30
283
87,700 m² / 943,995 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Completed
Retrofit Start
Retrofit End
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
29 January 2015 - Event
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.