You must be a CTBUH Member to view this resource.
Torre Europarco
Provincia di Roma Headquarters
Building
Completed
2012
Office
All-Concrete
103.4 m / 339 ft
31
2
631
12
3 m/s
37,000 m² / 398,265 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Europarco Business Park is a new development on the south side of Rome; a mixed-use complex which encourages adjacent business and residential buildings. Europarco Tower is the main office tower of the complex, and is intended to act as the main icon of the community.
The skin of the building was developed to respond to environmental conditions, involving the use of insulated panels interspersed within the façade system, as well as vertical fins and solar blinds for shading. The cladding system is made of prefabricated units which are either glazed or opaque, and are arranged in order to provide optimum daylighting for each interior space. The glazed units are also operable, allowing users to control natural ventilation to the space.
The building draws on the tri-generation power plant of the complex, using highly efficient power. It also has a rainwater harvesting system which will supply water for toilets and irrigation.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy