You must be a CTBUH Member to view this resource.
Triptych Bankside-West Building
185 Park Street Tower 1
Building
Completed
2022
Residential
64.5 m / 212 ft
19
2
2
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
22 September 2021
Triptych Bankside complex in central London has topped out at 19 floors. The US$545 million (£400 million) mixed-use project includes three buildings, two residential and...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy