You must be a CTBUH Member to view this resource.
Two Snowhill
Two Snow Hill Plaza
Building
Completed
2013
Office
Composite
75 m / 246 ft
15
3
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
03 November 2022
Plans have been proposed by Metropolitan Workshop for a 48-story residential tower in the center of Birmingham, which would include 462 units at 2 Snowhill Plaza close...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy