Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
University Center South Tower
Stevens Institute of Technology University Center North Tower
Building
Under Construction
2021
Residential / Education
All-Concrete
19
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 August 2020
Construction is nearing the halfway mark on the much-anticipated Student Housing and University Center at Stevens Institute of Technology in Hoboken, New Jersey. Design Collective...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy