Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Waldorf Astoria Hotel and Residences Miami
300 Biscayne
Building
Under Construction
2028
Residential / Hotel
All-Concrete
317.3 m / 1,041 ft
98
461
205
694
149,431 m² / 1,608,462 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
27 May 2022
Foundation permits have been issued for 300 Biscayne Boulevard, the site of the upcoming 98-story Waldorf Astoria Hotel & Residences. The project’s developers, Property Markets...
27 May 2022
Foundation permits have been issued for 300 Biscayne Boulevard, the site of the upcoming 98-story Waldorf Astoria Hotel & Residences. The project’s developers, Property Markets...
06 April 2021
Developers Property Markets Group (PMG) and Greybrook Realty Partners have officially announced their next grand development, and it will come in the form of a...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.