RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
---|---|---|---|
1 | Wells Fargo Plaza | 103 m / 338 ft | |
2 | Murano Hotel | 84.7 m / 278 ft | |
3 | Marriott Tacoma Downtown | 79.2 m / 260 ft | |
4 | The Astor at the Washington Building | 72.3 m / 237 ft | |
5 | Tacoma Municipal Building | 71 m / 233 ft | |
6 | Key Bank Tower | 70.7 m / 232 ft | |
7 | Tacoma Financial Center | 70.1 m / 230 ft |
Not enough data. Please change your search criteria.
04 April 2022
Making Tall Timber Financially Viable: the Design-Build Approach
As the tall building industry increasingly becomes interested in using engineered mass timber to construct high-rise buildings, the economical and construction-efficiency advantages need to be...
17 October 2022
Another Historic Tacoma Building is Renovating to Rentals
Owners of a historic office building, originally known as the Sandberg-Schoenfeld building that was completed in 1908 and has since been called DaVita Building, will...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policyWe are identifying potential improvements to the CTBUH Skyscraper Center database. The first step of this research is to understand the users of the database and what they are looking for. Please take a couple moments to share your feedback.
* Required