Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height |
---|---|---|---|
1 |
125.6 m / 412 ft |
||
2 |
100 m / 328 ft |
||
3 |
91.9 m / 302 ft |
||
4 |
90 m / 295 ft |
||
5 |
85 m / 279 ft |
||
6 |
81 m / 266 ft |
||
7 |
80 m / 262 ft |
||
8 |
80 m / 262 ft |
||
9 |
72 m / 236 ft |
||
10 |
60 m / 197 ft |
Not enough data. Please change your search criteria.
Logo
|
Name
|
City
|
Level
|
# of 150m+ buildings
|
|
---|---|---|---|---|---|
![]() |
Silver |
139 |
MATR |
Tall Timber: A Global Audit
26 June 2017
The CTBUH has produced its latest Tall Buildings…
09 September 2020
Excavation Work Complete for Zurich Building
Austrian construction company Porr announced that it has completed excavation work for the construction of the 80 meter Franklinturm building to be located in Zurich,...
28 November 2018
Zurich Voters Greenlight New Stadium and High-Rise Complex
A slim majority of voters in Zurich has greenlighted the construction of a new 18,000 all-seat football stadium in the city, which will be adjoined...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy