CTBUH Silver Member

Cortel Group

About

Member Since: 2018

Member Offices: Toronto

Website: http://cortelgroup.com/

Fields of Expertise

Developer

Membership details

Membership Level

Silver

Member Since

2018

Member Offices

  • Toronto

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

CG Tower

193.2 m / 634 ft

2

Nord East

123.5 m / 405 ft

3

Nord West

123.5 m / 405 ft

4

Expo 2

117.5 m / 386 ft

5

Expo 1

117.5 m / 385 ft

Building Completions Timeline

 
Rank
Name
City
Height

1

CG Tower

Vaughan

193 m

634 ft

2

Nord East

Vaughan

124 m

405 ft

2

Nord West

Vaughan

124 m

405 ft

4

Expo 2

Vaughan

118 m

386 ft

5

Expo 1

Vaughan

118 m

385 ft

6

Expo 3

Vaughan

- m

- ft

7

Oak & Co Tower 1

Oakville

- m

- ft

8

Oak & Co Tower 2

Oakville

- m

- ft

9

Oak & Co Tower 4

Oakville

- m

- ft

10

Oak & Co Tower 3

Oakville

- m

- ft

Statistics

150 m+ Buildings

Average Building Age*

3 Years

Most Common Function*

Residential (100%), 4 Buildings

Most Common Material*

Concrete (100%), 5 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 4 Buildings for which a function has been assigned.
 
Total: 5 Buildings for which a material has been assigned.
 

*Based on 5 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.