Member Since: 2015
Member Offices: Jerusalem
Façade Design / Engineering; Materials / Products / Systems Supplier
Membership Level
Participant
Member Since
2015
Member Offices
Jerusalem
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Never Completed Proposed Vision Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
2017 |
238.4 m / 782 ft |
||
2 |
2016 |
158 m / 518 ft |
||
3 |
2000 |
140 m / 459 ft |
||
4 |
2019 |
115.3 m / 378 ft |
||
5 |
2019 |
110.3 m / 362 ft |
Ron Arad Associates has revealed a twisted tower that is narrow at the base but widens at the top, built as the first phase of...
150 m+ Buildings
Average Building Age*
7 Years
Most Common Function*
Office, 3 Buildings
Most Common Material*
Concrete, 5 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 5 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy