CTBUH Silver Member

Aluminum Construction Group

About

Member Since: 2015

Member Offices: Jerusalem

Website: http://www.alcon.co.il

Fields of Expertise

Fa├žade Design / Engineering; Materials / Products / Systems Supplier

Membership details

Membership Level

Participant

Member Since

2015

Member Offices

  • Jerusalem

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Azrieli Sarona Tower

238.4 m / 782 ft

2

Amot Atrium Tower

158 m / 518 ft

3

Tel Aviv Towers I

140 m / 459 ft

4

Arlozorov 17

115.3 m / 378 ft

5

ToHA Tower 1

110.3 m / 362 ft

Building Completions Timeline

 

Global News

14 June 2019

Twisting Office Tower Nears Completion in Tel Aviv

Ron Arad Associates has revealed a twisted tower that is narrow at the base but widens at the top, built as the first phase of...

Statistics

150 m+ Buildings

Average Building Age*

7 Years

Most Common Function*

Office (60%), 3 Buildings

Most Common Material*

Concrete (100%), 5 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 5 Buildings for which a function has been assigned.
 
Total: 5 Buildings for which a material has been assigned.
 

*Based on 5 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.