CTBUH Silver Member

MAURER SE

About

Member Since: 2015

Member Offices: Munich

The MAURER Group is a leading specialist in mechanical engineering and steel construction with over 1,000 employees worldwide. The company is the market leader in the areas of structural protection systems, (bridge bearings, expansion joints, seismic devices). It also develops and produces professional roller coasters and Ferris wheels as well as special structures in steelwork.

Key products in structural design are Tuned Mass Dampers, semi-active dampers, hydraulic dampers etc. Among the most notable large projects are the entire technological bridging equipment for the Russky Bridge in Wladiwostok, the world’s largest cable-stayed bridge. When it comes to steelwork, their showpieces include the BMW World and Munich‘s Airport Terminal 2.

Fields of Expertise

Engineering, Other; Materials / Products / Systems Supplier; Mechanical, Electrical & Plumbing; Seismic Design; Structural Engineering

Membership details

Membership Level

Silver

Member Since

2015

Member Offices

  • Munich

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Never Completed

Proposed

Vision

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Baku Tower

276.3 m / 906 ft

2

DC Tower I

220 m / 722 ft

3

SOCAR Tower

195.9 m / 643 ft

Awards

DC Tower

Award of Excellence: DC Tower

Best Tall Building Europe 2014

Ctbuh Leaders

Felix Weber

Felix Weber

CTBUH Annual Conference, Presenter, 2018

Zurich

Building Completions Timeline

 

Research

17 October 2016

Real-Time Controlled TMD of Danube City Tower

Since 2014, a MAURER controlled TMD has mitigated the first bending mode of the Danube City Tower in Vienna, Austria. It consists of a pendulum...

Associated companies

MAURER AG (2016)

Statistics

150 m+ Buildings

Average Building Age*

7 Years

Most Common Function*

Office, 2 Buildings

Most Common Material*

Composite, 2 Buildings

* Based on 150 m+ buildings currently in the database.

 
 

*Based on 3 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

Gross-to-Net Height

NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.