CTBUH Silver Member

Royal HaskoningDHV

About

Member Since: 2009

Member Offices: Nijmegen

Royal HaskoningDHV is an independent, international engineering consultancy providing services for the entire living environment. Their work contributes to the sustainable development of the communities they work in all over the world.

They believe that meaningful solutions cannot be created without collaboration with their partners, clients and other stakeholders. Together, they enhance society.

Fields of Expertise

Building Automation Control Systems; Building Maintenance; Civil Engineering; Cost Consulting; Environmental Engineering; Environmental Protection; Façade Design / Engineering; Fire Engineering; Geotechnic / Foundations; Mechanical, Electrical & Plumbing; Security Consultancy; Seismic Design; Structural Engineering; Surveying; Transportation / Urban Infrastructure; Urban Design; Wind Engineering

Membership details

Membership Level

Silver

Member Since

2009

Member Offices

  • Nijmegen

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Never Completed

Proposed

Vision

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Shenzhen Stock Exchange

245.8 m / 806 ft

2

CCTV Headquarters

234 m / 768 ft

3

New Orleans

158.4 m / 520 ft

4

De Rotterdam

151.3 m / 496 ft

5

Rembrandt Tower

150 m / 492 ft

6

IJ Mast

150 m / 492 ft

7

Millennium Tower

149 m / 489 ft

8

New Babylon City Tower

141.8 m / 465 ft

9

Het Strijkijzer

131.6 m / 432 ft

10

De Kroon

131.2 m / 430 ft

Awards

De Rotterdam

Winner: De Rotterdam

Best Tall Building Europe 2014

Ctbuh Leaders

Jan N. J. A. Vambersky

Jan N. J. A. Vambersky

CTBUH Awards Jury, 2005

Delft

Maurice Hermens

Maurice Hermens

CTBUH Awards MEP Engineering Jury, 2021

Rotterdam

Building Completions Timeline

 

Videos

16 September 2014

Ultra Light Weight Solutions for Sustainable Urban Densification

This presentation shows, through the realized case project “De Karel Doorman” in Rotterdam, how ultra lightweight solutions for apartments and other building types can be...

Research

16 September 2014

Ultra Light Weight Solutions for Sustainable Urban Densification

This paper shows, through the realized case project “De Karel Doorman” in Rotterdam, how ultra lightweight solutions for apartments and other building types can be...

Global News

30 September 2019

New Hotel in Amsterdam’s Business District Nears Completion

In 2015, the Office for Metropolitan Architecture’s (OMA) design for a hotel, led by partner Reinier de Graaf, in Amsterdam received approval from local authorities,...

Associated companies

Statistics

150 m+ Buildings

Average Building Age*

16 Years

Most Common Function*

Office, 16 Buildings

Most Common Material*

Concrete, 7 Buildings

* Based on 150 m+ buildings currently in the database.

 
 

*Based on 36 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

Gross-to-Net Height

NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.