CS Associates, Inc. is a consulting structural engineering firm established in 1974, specializing in building design. Their projects include commercial, institutional, and residential buildings which range in magnitude from $500,000 to $250,000,000.
They have designed a variety of low-rise and high-rise structural frames utilizing braced frames, moment resistant frames, shear walls and structural tubes. The materials used on these projects include timber, structural steel, precast concrete, and cast-in-place concrete; conventionally reinforced and post-tensioned.
They have established a reputation with their clients, which include architects, developers, and contractors, for furnishing accurate preliminary framing systems allowing them to establish the most cost effective system for their project.
Cost Consulting; Historical Preservation; Structural Engineering
Membership Level
Silver
Member Since
1996
Member Offices
Chicago
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
2000 |
257.4 m / 844 ft |
||
2 |
2010 |
249.3 m / 818 ft |
||
3 |
2010 |
226.7 m / 744 ft |
||
4 |
2001 |
196.3 m / 644 ft |
||
5 |
2005 |
192.4 m / 631 ft |
||
6 |
2003 |
185.9 m / 610 ft |
||
7 |
2017 |
178.9 m / 587 ft |
||
8 |
2003 |
174.8 m / 574 ft |
||
9 |
2009 |
168.8 m / 554 ft |
||
10 |
1992 |
164.1 m / 539 ft |
A 57-story apartment tower in the Streeterville neighborhood plans to convert some of its office space to small classrooms, betting that frazzled families will seek...
New Jersey-based Strategic Properties of North America (SPNA) has partnered with South Korean investor Mirae Asset Daewoo to acquire a luxury Chicago apartment building for...
150 m+ Buildings
Average Building Age*
16 Years
Most Common Function*
Residential (79%), 45 Buildings
Most Common Material*
Concrete (96%), 54 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 57 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy