Developer
Membership Level
Silver
Member Since
2018
Member Offices
Toronto
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
2018 |
224 m / 735 ft |
||
2 |
2015 |
169.6 m / 557 ft |
||
3 |
2014 |
157.9 m / 518 ft |
||
4 |
2020 |
157.3 m / 516 ft |
||
5 |
2021 |
147.9 m / 485 ft |
||
6 |
2019 |
145.1 m / 476 ft |
||
7 |
2022 |
138.1 m / 453 ft |
||
8 |
2021 |
138 m / 453 ft |
||
9 |
2016 |
137.3 m / 450 ft |
||
10 |
2020 |
136.3 m / 447 ft |
The astronomical growth in tall building construction observed over the past decade continued in 2018, though the total number of completed buildings of 200 meters’...
This paper is intended to introduce the upcoming CTBUH technical guide titled “The Space Between,” which investigates the importance of publicly accessible spaces surrounding tall...
Downtown Toronto’s Front and Spadina intersection is a hive of construction activity as work progresses for a mixed-use megaproject on a 7.8-acre (3.2-hectare) site. Known...
150 m+ Buildings
Average Building Age*
14 Years
Most Common Function*
Residential (86%), 54 Buildings
Most Common Material*
Concrete (100%), 62 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 64 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy