Member Offices: Munich
BAUER Spezialtiefbau GmbH, the original parent company of the BAUER Group, has been a major driving force in the development of specialist foundation engineering. It carries out all of the customary processes of foundation engineering, primarily for excavation pits, foundations, cut-off walls and ground improvements on a worldwide basis. In doing so, BAUER Spezialtiefbau GmbH works closely together with their over 50 subsidiaries and branches across the globe. Regional networks around the world allow for the quick and flexible application of machines, teams and expertise. BAUER Spezialtiefbau offers their customers individual, creative and economical specialist foundation engineering solutions for demanding construction projects, from planning through to execution. More at www.bauer.de
Geotechnic / Foundations
Membership Level
Silver
Member Since
Member Offices
Munich
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Never Completed Proposed Vision Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
2019 |
462 m / 1,516 ft |
||
2 |
2020 |
362.9 m / 1,191 ft |
||
3 |
2022 |
295.8 m / 971 ft |
||
4 |
2012 |
268 m / 879 ft |
||
5 |
2023 |
254.6 m / 835 ft |
||
6 |
2020 |
249 m / 817 ft |
||
7 |
2019 |
248.9 m / 816 ft |
||
8 |
2013 |
233.2 m / 765 ft |
||
9 |
2018 |
209.1 m / 686 ft |
||
10 |
2021 |
196.5 m / 645 ft |
The site of a former Greyhound bus terminal will soon be animated with new life. At the northwest corner of Sherbourne and Front in Toronto’s...
The Petronas Twin Towers, may lose its title as Malaysia’s tallest building(s), when The Exchange 106 and Menara PNB 118 are completed in Kuala Lumpur....
Excavation work has commenced for 29th & 5th, Bjarke Ingels Group‘s proposed skyscraper at 3 West 29th Street in NoMad, New York City. Excavators, piling...
150 m+ Buildings
300 m+ Buildings
Average Building Age*
4 Years
Most Common Function*
Residential, 10 Buildings
Most Common Material*
Concrete, 15 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 31 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy