About

Member Since: 2014

Member Offices: Tel Aviv

Website: http://en.wxg.co.il/

WXG is at the forefront of project management technology in the field of civil engineering. The group has developed a unique ERP system, WXGProjecttm, which provides a complete and comprehensive answer to the management of projects and combines quality assurance tools, budget monitoring, schedule monitoring, knowledge sharing, and more.

The Group is a research partner of the Technion – Israel Institute of Technology in research concerning the possible applications of Lean Construction in the building industry in Israel, and in this framework is leading the use of the Building Information Modeling (BIM) technology as part of the company`s management tools.

Being a market leader, the Group is constantly developing IT systems and management tools, which add another important layer to the management methodology of the company.

Fields of Expertise

Civil Engineering; Project Management; Urban Design

Membership details

Membership Level

Participant

Member Since

2014

Member Offices

  • Tel Aviv

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Azrieli Sarona Tower

238.4 m / 782 ft

2

Landmark TLV Tower 1

205 m / 673 ft

3

Landmark TLV Tower 2

205 m / 673 ft

4

The Shahar Tower

201.5 m / 661 ft

5

Ha`arbaa Tower 1

160 m / 525 ft

6

Amot Atrium Tower

158 m / 518 ft

7

W-Tower

156.4 m / 513 ft

8

Rothschild Tower

154 m / 505 ft

9

Ha`arbaa Tower 2

146 m / 479 ft

10

Time Tower

145.7 m / 478 ft

Building Completions Timeline

 

Associated companies

Statistics

150 m+ Buildings

Average Building Age*

6 Years

Most Common Function*

Residential (55%), 11 Buildings

Most Common Material*

Concrete (100%), 18 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 20 Buildings for which a function has been assigned.
 
Total: 18 Buildings for which a material has been assigned.
 

*Based on 20 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.