CTBUH Silver Member

Ortiz Leon Arquitectos

About

Member Since: 2013

Member Offices: Madrid

Website: http://www.ortizleon.com

Since their foundation in 1984, ORTIZ LEON ARQUITECTOS has been working to offer their clients the better architecture proposal as response to requirements.

The use of latest design techniques, the best staff team and collaborators and the need of diary improvement in ORTIZ LEON architecture result as a national and international reference.

Specialization in sustainable architecture in housing and office developments has arisen ORTIZ LEON to be the first office in Spain to achieve the LEED certification and to be a Spanish leader in office headquarters and tall buildings development. Their work has been recognized with several awards from different organizations concerned with environment care and, in the last years, with LEED certification.

Fields of Expertise

Architecture; Historical Preservation; Interior Design

Membership details

Membership Level

Silver

Member Since

2013

Member Offices

  • Madrid

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Torre Iberdrola

165 m / 541 ft

2

Torre Mapfre

154 m / 505 ft

3

La Vela

92.8 m / 304 ft

Building Completions Timeline

 

Research

16 September 2014

Architectural Comfort in Future Vertical Downtowns

The objective of this paper is to alert about how important is environmental comfort, as an architectural concept, in vertical urbanism and its perception by...

Associated companies

Statistics

150 m+ Buildings

Average Building Age*

15 Years

Most Common Function*

Office (100%), 3 Buildings

Most Common Material*

Concrete (50%), 1 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 3 Buildings for which a function has been assigned.
 
Total: 2 Buildings for which a material has been assigned.
 

*Based on 3 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.