Filter by
The long experience of the Technical Director of ECSD, Professor Mola, in structural design, makes for years the privileged reference to clients, both public and private, that require advice on the effectiveness, fairness, and durability of solution design details.
The importance of manufacturing, the delicacy of the construction phases, the presence of problems related to the implementation or the need for cost optimization and performance drives ECSD to carry out detailed structural analysis and refined solutions.
ECSD also collaborates with leading research institutions, such as the Polytechnic of Milan in particular, for research and development and certification of new products, materials, prefabricated structural elements, in order to reach solutions more efficiently and competitively in the market.
Property Management; Structural Engineering
Membership Level
Silver
Member Since
2013
Member Offices
Milan
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height |
---|---|---|---|
1 |
209.2 m / 686 ft |
CTBUH Skybridges Research Project Steering Committee, 2019 – Present
David Partridge, Argent; Neven Sidor & Temoor Ahmad, Grimshaw Architects; Franco Mola, ECSD, answer questions at the end of 2015 New York Conference Session 4c:...
The Allianz Tower, Milan, part of the CityLife complex, is notable for its slenderness and the eye-catching presence of four diagonal struts that stabilize it...
Major designs by internationally renowned architects, are currently under construction in Italy in the cities of Milan and Turin. In the decade 2005-2015, a dramatic...
150 m+ Buildings
Average Building Age*
6 Years
Most Common Function*
Office (100%), 1 Buildings
Most Common Material*
Concrete (100%), 1 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 1 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy