About

Member Since: 2012

Member Offices: Madrid

ENAR is a Spanish technological facade consulting that started as a business firm in the year 1999 in response to a need created in the market of architects and developers to service the design of non-traditional facades, and to promote quality in their execution.

ENAR offers quality, innovation and objectivity, which is reflected in its professional development, suited to the customer needs at all times. ENAR aims to provide confidence to all customers with its knowledge and independence in the world of facades.

Their team is mainly formed by architects with technical training which allows an easy and close dialogue with the design team, always taking into account facades and roof technical requirements.

Fields of Expertise

Engineering, Other; Façade Design / Engineering

Membership details

Membership Level

Silver

Member Since

2012

Member Offices

  • Madrid

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Never Completed

Proposed

Vision

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

The Landmark

324 m / 1,063 ft

2

Torre de Cristal

249 m / 817 ft

3

Torre Sevilla

180.5 m / 592 ft

4

Torre Iberdrola

165 m / 541 ft

5

Torre Europa

116.1 m / 381 ft

Awards

Torre Europa

Award of Excellence: Torre Europa

Renovation Award 2019

Ctbuh Leaders

Miguel Núñez

Miguel Núñez

CTBUH Awards Façade Engineering Jury, 2020

Madrid

Jesús Cerezo

Jesús Cerezo

CTBUH Annual Conference, Poster Presenter, 2019

Madrid

Building Completions Timeline

 

Research

26 October 2015

Fiber Reinforced Polymer (FRP): A New Material Used in Façades of Tall Buildings

Current architecture is changing the traditional concept of buildings meaning it is essential to rethink about the materials that are involved in construction. One of...

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

14 Years

Most Common Function*

Mixed-use, 3 Buildings

Most Common Material*

Concrete, 5 Buildings

* Based on 150 m+ buildings currently in the database.

 
 

*Based on 5 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

Gross-to-Net Height

NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.