CTBUH Silver Member

b720 Fermín Vázquez Arquitectos

About

Member Since: 2019

Member Offices: Barcelona

b720 Fermín Vázquez Arquitectos is first and foremost a team. The study, founded in 1997 and led by Fermín Vázquez -a founding partner along with Ana Bassat- produces architecture that is resolutely contemporary and reflects its commitment to the responsible use of natural resources.The coherence of the firm’s work is based on a distinctive way of working that deliberately avoids the development of a particular style or formalistic approach. Each project emerges from the search for a specific solution with clients and society as essential reference points. The response to the programme, context, budget and time constraints is necessarily unique.b720’s team pays great attention into constructive process to give the project the largest possible quality. In this work are involved more than thirty professionals between architects and partners spread between the offices in Madrid, Barcelona.

Fields of Expertise

Architecture

Membership details

Membership Level

Silver

Member Since

2019

Member Offices

  • Barcelona

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Never Completed

Proposed

Vision

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Torre Glòries

144.4 m / 474 ft

2

Hotel Porta Fira

113.6 m / 373 ft

3

Torre Realia BCN

113.3 m / 372 ft

4

Forma Itaim

85.9 m / 282 ft

5

Diagonal 197

72 m / 236 ft

Awards

Forma Itaim

Winner: Forma Itaim

Best Tall Building under 100 meters 2019

Ctbuh Leaders

Fermín Vázquez

Fermín Vázquez

CTBUH Innovation Conference, Speaker, 2019

Barcelona

Building Completions Timeline

 

Statistics

Average Building Age*

11 Years

Most Common Function*

Office, 2 Buildings

Most Common Material*

Concrete, 3 Buildings

* Based on 150 m+ buildings currently in the database.

 
 

*Based on 5 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

Gross-to-Net Height

NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.