CTBUH Silver Member

B+H Architects

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

First Canadian Place

298.1 m / 978 ft

2

Bodi Center Tower C

279.7 m / 918 ft

3

Hong Kong New World Tower

278.3 m / 913 ft

4

Brookfield Place

260.9 m / 856 ft

5

160 Front

240 m / 787 ft

6

Sugar Wharf Tower D

230.2 m / 755 ft

7

Pullman Shanghai Skyway Hotel

226 m / 741 ft

8

TD Tower

222.8 m / 731 ft

9

Sugar Wharf Tower E

218.4 m / 717 ft

10

Bay-Wellington Tower

207 m / 679 ft

Building Completions Timeline

 

Global News

08 March 2021

New "Use-Neutral" Tower Typology Offers Futureproof-Adaptability

A group of like-minded architects, builders, and engineers, including B+H Architects, Mortenson, Coffman Engineers, and Robert Bird Group, are working on a new type of...

Global News

25 August 2020

Waterfront Office Tower Tops Out In Toronto

Menkes Developments Ltd. ("Menkes"), with TD Asset Management Inc. (TDAM), is pleased to announce the completion of the exterior structure of its landmark office tower,...

Global News

07 August 2020

Canadian-Based Architect Wins Competition for Shenzhen Children’s Hospital

Canadian design firm B+H Architects and the East China Architectural Design & Research Institute (ECADI), has won an international competition to design an addition to...

Associated companies

Statistics

150 m+ Buildings

Average Building Age*

28 Years

Most Common Function*

Office (61%), 25 Buildings

Most Common Material*

Concrete (70%), 19 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 41 Buildings for which a function has been assigned.
 
Total: 27 Buildings for which a material has been assigned.
 

*Based on 41 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.