Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | Mokdong Hyperion Tower A | 2003 | 256 m / 840 ft | 69 | concrete | residential | |
2 | Mokdong Hyperion Tower B | 2003 | 239.3 m / 785 ft | 63 | concrete | residential | |
3 | Mokdong Hyperion Tower C | 2003 | 201.2 m / 660 ft | 54 | concrete | residential |
10 October 2004
The effect of column shortening is a major consideration in the design and construction of tall buildings, especially in concrete and composite structural systems. The...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy