Belgrade Waterfront

Belgrade
  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Official Name
The current legal building name.

Belgrade Waterfront

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Country

Serbia

City

Belgrade

Function

hotel / residential

# of Apartments

220

# of Hotel Rooms

119

# of Parking Spaces

305

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

RANK
Name
Height
1 Kula Belgrade

168 m / 551 ft

Global News

27 January 2021

Belgrade Tower Set to Be Completed Within 2021

The President of Serbia, Aleksandar Vučić, visited the construction site of the Belgrade Waterfront. The construction site tour was also attended by the Minister of...

27 January 2021

Belgrade Tower Set to Be Completed Within 2021

The President of Serbia, Aleksandar Vučić, visited the construction site of the Belgrade Waterfront. The construction site tour was also attended by the Minister of...

07 February 2019

Building Permit Issued to Build Kula Beograd in Belgrade

The Serbian Ministry of Construction, Transportation, and Infrastructure has issued a building permit for the construction of the Kula Beograd (Tower Belgrade) building. The building,...