M City

Mississauga
  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Official Name
The current legal building name.

M City

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Under Construction

Country

Canada

Function

residential

Master Planner

Cooper Robertson

# of Apartments

1,672

Development GFA
Development GFA refers to the total gross floor area within the entire development in which a tower exists, and may therefore be at times the total sum of several towers and related low-rise buildings.

400,000 m² / 4,305,564 ft²

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

Rank
Building Name
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Completion
Height
Floors
Material
Use
1 M3 at M City
2023 260.3 m / 854 ft 77 All-Concrete Residential
2 M City Tower 4
2024 215.6 m / 707 ft 67 All-Concrete Residential
3 M2
2023 201 m / 659 ft 62 All-Concrete Residential
4 M1
2023 198 m / 650 ft 61 All-Concrete Residential
5 M City Tower 10
- - m / - ft 41 All-Concrete Residential
6 M City Tower 5
- - m / - ft - All-Concrete Residential
6 M City Tower 6
- - m / - ft - All-Concrete Residential
6 M City Tower 7
- - m / - ft - All-Concrete Residential
6 M City Tower 8
- - m / - ft - All-Concrete Residential
6 M City Tower 9
- - m / - ft - All-Concrete Residential

Global News

25 June 2021

Trio of Towers within Larger Mississauga Master Plan Progress

In Mississauga, a westward shift in the city's emerging Downtown is reaching a climactic point with the development of three towers at Burnhamthorpe Road and...

25 June 2021

Trio of Towers within Larger Mississauga Master Plan Progress

In Mississauga, a westward shift in the city's emerging Downtown is reaching a climactic point with the development of three towers at Burnhamthorpe Road and...

10 December 2020

Multi-Tower Complex Moves Forward in Mississauga

Cooper Robertson continues to advise on planning and design as the CA$1.15 billion (US$900 million) project moves towards phased completion. Rising to 81 stories, M...

28 September 2020

Mississauga Breaks Ground on What Could Become the Tallest Building in Town

The city of Mississauga recently broke ground on M3, the third and tallest condo tower at M City (a massive eight-condo tower community that’s taking...