Tours Helka
Complex
Completed
office / residential
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | HEKLA | 2022 | 220 m / 722 ft | 48 | All-Concrete | Office | |
2 | Tours Helka Student Dortoir | 2018 | 75 m / 246 ft | 22 | All-Concrete | Residential |
14 July 2021
In La Défense just outside of Paris, the Hekla tower is over halfway completed. The project has completed 30 of 49 floors, with a final...
14 July 2021
In La Défense just outside of Paris, the Hekla tower is over halfway completed. The project has completed 30 of 49 floors, with a final...
01 July 2019
The currently under-construction Hekla Tower at La Défense is emblematic of next-generation skyscrapers: one that is integrated with the urban habitat. The building, which is...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy