You must be a CTBUH Member to view this resource.
AVIC Astoria
Complex
Completed
office / residential
472
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | Astoria Phase 1 West Tower | 2018 | 145 m / 476 ft | - | All-Concrete | Residential | |
2 | Astoria Phase 1 East Tower | 2018 | 140 m / 459 ft | 41 | All-Concrete | Residential | |
3 | Astoria Phase 2 West Tower | 2020 | 112 m / 367 ft | 33 | All-Concrete | Residential | |
4 | Astoria Commercial Tower | 2020 | 65 m / 213 ft | 15 | All-Concrete | Office |
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy