Quayside
Complex
Vision
residential
Note: Only buildings that have GPS coordinates recorded are displayed.
Rank
|
Building Name
|
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
|
Completion
|
Height
|
Floors
|
Material
|
Use
|
---|---|---|---|---|---|---|---|
1 | Quayside Site 1 - Building 1 | - | - m / - ft | 30 | All-Timber | Residential | |
1 | Quayside Site 3 - Building 1 | - | - m / - ft | 30 | All-Timber | Residential | |
1 | Quayside Site 4 | - | - m / - ft | 30 | All-Timber | Residential | |
4 | Quayside Site 2 - Building 1 | - | - m / - ft | 25 | All-Timber | Residential | |
4 | Quayside Site 2 - Building 2 | - | - m / - ft | 25 | All-Timber | Residential | |
6 | Quayside Site 1 - Building 2 | - | - m / - ft | 15 | All-Timber | Residential | |
6 | Quayside Site 2 - Building 3 | - | - m / - ft | 15 | All-Timber | Residential | |
8 | Quayside Site 5 - Building 1 | - | - m / - ft | 14 | All-Timber | Residential |
31 October 2019
Karim Khalifa, Director of Buildings Innovation at Sidewalk Labs, speaks at the 2019 CTBUH International Congress in Chicago on 31 October 2019.
25 January 2019
Can one of the world’s oldest building materials form the foundation of a sensor-integrated “smart” neighborhood? Alphabet subsidiary Sidewalk Labs is making a go of...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy