Saifee Burhani Upliftment Project

Mumbai
Official Name
The current legal building name.

Saifee Burhani Upliftment Project

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

Bhendi Bazaar Redevelopment

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Country

India

City

Mumbai

Function

residential

Master Planner

Tricone Design Studio LLP

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.

RANK
Name
Height
1 Saifee Burhani Upliftment Project Sector 3A, North Tower

140 m

459 ft

Please note that this height is estimated, based on a floor count of 41 floors. The estimation has been arrived at by analyzing 9,353 other buildings of the same Residential function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
2 Saifee Burhani Upliftment Project Sector 3A, South Tower

123 m

404 ft

Please note that this height is estimated, based on a floor count of 36 floors. The estimation has been arrived at by analyzing 9,353 other buildings of the same Residential function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.

Global News

10 March 2020

Families Begin Moving into New Mumbai Residential District

A new cluster redevelopment in Mumbai, the Saifee Burhani Upliftment Project, has now welcomed 610 families into two new buildings. After many failed attempts over...