New Administrative Capital Central Business District

Cairo
Official Name
The current legal building name.

New Administrative Capital Central Business District

Type

Complex

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Architecturally Topped Out

Country

Egypt

City

Cairo

Function

hotel / office / residential

Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 

List of Buildings in Complex

Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.

RANK
Name
Height
1 Iconic Tower

394 m / 1,292 ft

2 New Administrative Capital Building D01

196 m / 643 ft

3 New Administrative Capital Building C01

174 m / 571 ft

4 New Administrative Capital Building C04

170 m / 558 ft

5 New Administrative Capital Building C11

160 m / 525 ft

5 New Administrative Capital Building C12

160 m / 525 ft

7 New Administrative Capital Building C07

140 m

459 ft

Please note that this height is estimated, based on a floor count of 32 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
7 New Administrative Capital Building C08

140 m

459 ft

Please note that this height is estimated, based on a floor count of 32 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
9 New Administrative Capital Building C05

79 m

259 ft

Please note that this height is estimated, based on a floor count of 18 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
9 New Administrative Capital Building C06

79 m

259 ft

Please note that this height is estimated, based on a floor count of 18 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
11 New Administrative Capital Building D02

- m / - ft

11 New Administrative Capital Building D03

- m / - ft

11 New Administrative Capital Building D04

- m / - ft

11 New Administrative Capital Building D05

- m / - ft

11 New Administrative Capital Building C02

- m / - ft

11 New Administrative Capital Building C03

- m / - ft

Research

22 August 2022

Structural Design of Iconic Tower, Egypt: Culmination of a Concrete Optimization Process

Tarek Hassan, Yehia El-Ezaby & Charles Malek, rector Dar Al Handasah Consultants (Shair and Partners)

This paper presents an overview of a process of optimizing concrete mixture for tall buildings, culminating in the design of the Iconic Tower, the key...

 

Global News

18 July 2022

Concrete Structure Reaches Completion for Tower in Egypt’s New Administrative Capital, Cairo

The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure and finishing touches are now underway.  It is one of...

18 July 2022

Concrete Structure Reaches Completion for Tower in Egypt’s New Administrative Capital, Cairo

The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure and finishing touches are now underway.  It is one of...

23 July 2021

Tower in Egypt’s New Administrative Capital Tops Out

The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure. It is one of 18 skyscrapers planned for NAC’s Central...

18 January 2021

First Tower in Egypt's New Capital District Near Cairo Complete

The first office tower in Egypt's New Administrative Capital (NAC) has been completed, according to China State Construction Engineering Corporation (CSCEC). The C08 building, which...

17 March 2020

First Skyscraper Capped in Egypt’s New Administrative Capital

China State Construction Engineering Corporation (CSCEC) has finished the capping of the first skyscraper in the 20-tower business district that it is building in Egypt's...

21 January 2019

Construction Begins on Iconic Tower

The foundations for what could become Africa’s tallest building, a 385-meter-tall tower in Egypt’s new administrative capital, will be poured within days, according to the...