New Administrative Capital Central Business District
Complex
Architecturally Topped Out
hotel / office / residential
Note: Only buildings that have GPS coordinates recorded are displayed.
Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.
RANK
|
Name
|
Completion
|
Height
|
Floors
|
Function
|
---|---|---|---|---|---|
1 | Iconic Tower | 2024 |
394 m / 1,292 ft |
77 | Hotel / Residential / Office |
2 | New Administrative Capital Building D01 | 2024 |
196 m / 643 ft |
49 | Residential |
3 | New Administrative Capital Building C01 | 2024 |
174 m / 571 ft |
35 | Office |
4 | New Administrative Capital Building C04 | 2024 |
170 m / 558 ft |
34 | Office |
5 | New Administrative Capital Building C11 | 2024 |
160 m / 525 ft |
27 | Office |
5 | New Administrative Capital Building C12 | 2024 |
160 m / 525 ft |
27 | Office |
7 | New Administrative Capital Building C07 | 2024 |
140 m / 459 ft
Please note that this height is estimated, based on a floor count of 32 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
|
32 | Office |
7 | New Administrative Capital Building C08 | 2024 |
140 m / 459 ft
Please note that this height is estimated, based on a floor count of 32 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
|
32 | Office |
9 | New Administrative Capital Building C05 | 2024 |
79 m / 259 ft
Please note that this height is estimated, based on a floor count of 18 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
|
18 | Office |
9 | New Administrative Capital Building C06 | 2024 |
79 m / 259 ft
Please note that this height is estimated, based on a floor count of 18 floors. The estimation has been arrived at by analyzing 7,073 other buildings of the same Office function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
|
18 | Office |
11 | New Administrative Capital Building D02 | 2024 |
- m / - ft |
45 | Residential |
11 | New Administrative Capital Building D03 | 2024 |
- m / - ft |
45 | Residential |
11 | New Administrative Capital Building D04 | 2024 |
- m / - ft |
39 | Residential |
11 | New Administrative Capital Building D05 | 2024 |
- m / - ft |
37 | Residential |
11 | New Administrative Capital Building C02 | 2024 |
- m / - ft |
15 | Office |
11 | New Administrative Capital Building C03 | 2024 |
- m / - ft |
15 | Office |
22 August 2022
Tarek Hassan, Yehia El-Ezaby & Charles Malek, rector Dar Al Handasah Consultants (Shair and Partners)
This paper presents an overview of a process of optimizing concrete mixture for tall buildings, culminating in the design of the Iconic Tower, the key...
18 July 2022
The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure and finishing touches are now underway. It is one of...
18 July 2022
The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure and finishing touches are now underway. It is one of...
23 July 2021
The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure. It is one of 18 skyscrapers planned for NAC’s Central...
18 January 2021
The first office tower in Egypt's New Administrative Capital (NAC) has been completed, according to China State Construction Engineering Corporation (CSCEC). The C08 building, which...
17 March 2020
China State Construction Engineering Corporation (CSCEC) has finished the capping of the first skyscraper in the 20-tower business district that it is building in Egypt's...
21 January 2019
The foundations for what could become Africa’s tallest building, a 385-meter-tall tower in Egypt’s new administrative capital, will be poured within days, according to the...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy