Huaguoyuan
Guiyang China
Height
1
To Tip:

Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).

335 m / 1,099 ft
2
Architectural:

Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

335 m / 1,099 ft
Floors
Above Ground

The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

74
Below Ground

The number of floors below ground should include all major floors located below the ground floor level.

2
Twin Towers Guiyang, East Tower Outline
Huaguoyuan
Complex
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Completed
hotel / office / residential
Map of Buildings in Complex

Note: Only buildings that have GPS coordinates recorded are displayed.

 
List of Buildings in Complex
Rank
Building Name
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Completion
Height
Floors
Material
Use
1
2020 335 m / 1,099 ft 74 composite office
1
2020 335 m / 1,099 ft 74 composite hotel / office
3
- 330 m / 1,083 ft - composite residential
3
- 330 m / 1,083 ft - composite residential

CTBUH Initiatives

Research

12 January 2021

CTBUH Research

The Council on Tall Buildings and Urban Habitat has released its annual report, CTBUH Year in Review: Tall Trends of 2020, part of the Tall...