Building List

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

See all status definitions

Height

1

Al Hamra Tower

412.6 m

1,354 ft

2

The Square Capital Tower

376 m

1,234 ft

3

The Assima Tower

301.6 m

990 ft

4

NBK Tower

300 m

984 ft

5

Arraya Tower

300 m

984 ft

6

Kipco Tower

240 m

787 ft

7

Crystal Tower

240 m

787 ft

8

Capital Markets Authority Headquarters

240 m

787 ft

9

The Central Bank of Kuwait New Headquarters Building

238.5 m

782 ft

10

Kuwait Investment Authority Headquarters

231 m

758 ft

11

Intercontinental Hotel and Tower

225 m

738 ft

12

Al Tijaria Tower

218.2 m

716 ft

13

Burj Alshaya West Tower

205 m

673 ft

14

Abdul Aziz Al Babtain Cultural WAQF

188.8 m

619 ft

15

Business Town Tower 5

184 m

604 ft

16

Kuwait Building Tower

175 m

574 ft

17

Dar Al Awadi

171 m

561 ft

18

25th February Tower

170 m

558 ft

19

Business Town Tower 6

168 m

551 ft

20

Panasonic Tower

167 m

548 ft

21

Al Jon Tower

160 m

525 ft

22

Al Jawhara Tower

160 m

525 ft

23

Arabiya Tower

150 m

492 ft

24

Baitak Tower

140 m

459 ft

25

Al Dhow Tower

137 m

449 ft

26

Injazzat Tower

132 m

433 ft

27

Arraya Centre

130 m

427 ft

28

Mazaya Tower 3

126 m

413 ft

29

Mazaya Tower 1

117 m

384 ft

30

Mazaya Tower 4

117 m

384 ft

31

Mazaya Tower 2

113 m

371 ft

32

Luxury 4-star Hotel

110 m

361 ft

33

Four Seasons at Burj Alshaya

95 m

312 ft

34

Wafra Tower

- m

- ft

35

26th February Tower

- m

- ft

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

10 Years

Most Common Function*

Office (89%)

Most Common Material*

Concrete (80%)

* Based on 150 m+ buildings currently in the database.

Total: 18 Buildings for which a function has been assigned.
 
Total: 15 Buildings for which a material has been assigned.
 

Based on 18 Buildings Over 150 m Height

Building Completions Timeline

* Based on 150 m+ buildings currently in the database.

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

Gross-to-Net Height

NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.