You must be a CTBUH Member to view this resource.
The Gabriella
Building
Completed
2020
Residential / Retail
All-Concrete
50.3 m / 165 ft
13
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
10 June 2019
At least one person has died and six were injured after a crane being used on the under-construction The Gabriella fell onto an apartment complex...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy